Live demonstrator
One site, read three ways: soil, groundwater, integrated.
The same choice you make when you build your own site. Toggle the soil (C1) baseline, the groundwater (C2) baseline, and the integrated reading of the two.
First request after a quiet period may take up to ~50 seconds while the engine wakes, then it's instant.
Demonstration site
A fixed site near Al Fagaa
One demonstration site at 24.96, 55.54, where the EAD soil survey is public. Pick which readings to show. The soil view runs the live engine; the groundwater and integrated views are illustrative demonstrations of how the same site reads.
Demonstration site: 24.9600, 55.5400.
Soil (C1) baseline
Live from GDM's soil-to-hydraulics engine and the EAD soil survey.
Click anywhere on the UAE map to classify the soil and derive its hydraulic behaviour.
Ready for your own site?
Build your own site, the same three ways
This previews the C1 and C2 baseline and the integrated reading on one fixed site. Configure your own project, draw its boundary, and scope the soil, groundwater, or integrated assessment.